Skip to main content
Whatsapp

Conventions for Addition, Alteration, and Revision Cases

Project Development Type​

  1. ADDITION_OR_ALTERATION - Select this when changes are made to the project after obtaining the Occupancy Certificate.
  2. REVISION - Select this when changes are made to the project before obtaining the Occupancy Certificate.
  3. NEW - Select this for entirely new projects.

Development Stage​

The Development Stage must be assigned to all Proposed Works and Floors in Sections within the project.

Selecting the Development Stage for Proposed Work​

  1. EXISTING - When the building mapped to the proposed work remains unchanged and has an Occupancy Certificate.
  2. PERMITTED - When the building mapped to the proposed work remains unchanged but does not have an Occupancy Certificate.
  3. ALTERED - When modifications have been made to the building mapped to the proposed work.
  4. PROPOSED - When a new building is mapped to the proposed work.

Selecting the Development Stage for Floor in Section:​

  1. EXISTING - Choose this if:
    1. If no changes have been made to the floor represented by this floor in section.
    2. Occupancy Certificate is obtained for the building containing this floor.
  2. PERMITTED - Select this option when:
    1. If no changes have been made to the floor represented by this floor in section.
    2. Occupancy Certificate is not obtained for the building containing this floor.
  3. ALTERED - Choose this if following changes are being made to the floor:
    • Examples of ALTERED cases include:
      • Change in BUA (Built-Up Area).
      • Change in Floor Type (e.g., from Habitable to Non-Habitable, such as converting a residential floor into parking).
      • Change in Floor Layout (e.g., rooms, passages, accessories).
  4. PROPOSED - Choose this for newly added floors.
Note

For REVISION projects, the marking process is the same as for ADDITION_OR_ALTERATION projects, with one key difference:

  • In REVISION projects, the Development Stage of unmodified Proposed Work or Floor in Section should be marked as PERMITTED.
  • In ADDITION_OR_ALTERATION projects, it should be marked as EXISTING.
Build Now