Skip to main content
Whatsapp

__BN_Plot

Reference Image

__BN_Plot

✏️ Data Inputs

  • In REVISION, ADDITION OR ALTERATION case, Plot Details input data
    • Is Plot Altered
    • When Plot is Altered, input data
      • Plot Use before alteration
      • Plot Subuse before alteration
      • Compound Wall Perimeter before alteration
      • Organised Open Space Area before alteration
      • Netplot Area before alteration
      • Gross Plot Area before alteration
      • Plot Parking Area before alteration

📐 Drawing Conventions

  • Plot polylines should be drawn within the Site Plan, representing the exact plot area.
  • Plot polylines should encompass all entities such as Proposed Works, Organized Open Spaces, and Areas to be deducted from the plot etc.
  • Plot polylines should have segments that exactly coincide with the Main Road or Private Road, or Pathway to provide access to the plot.

📏 Allowed Geometric Types

  • Closed Polyline

🏗️ Applicable Project Types

  • Building Permission
  • Layout With Housing And Gated Community & Layout With Housing Without Gated Community
  • Layout With Open Plots
  • Compound Wall

🏛️ Rules

  • Proposed Width of Main Abutting Road
  • Distance from the Center of the Main Abutting Road to the Net Plot
  • Width Comparison of the Main Abutting Road
  • Existence of Green Strip in Front Setback
  • Existence of Continuous Green Strip for the Plot
  • Organized Open Space Area
  • Count of Accessories
  • Net Plot Area
  • Presence of Green Strips in All Setbacks
  • Presence of Internal Road with a Width Greater than 7m
  • Count of Podiums
  • Existing Width of Main Abutting Road
  • Plot Width
Build Now