
- In case of Non High-Rise buildings, Balcony polyline must be drawn within the Built Up Area outline.
- In case of High-Rise buildings, Balcony polylines must be drawn outside the Built Up Area outline.
- At least one segment of the balcony polyline must exactly coincide with the Built Up Area outline.
- Doors and windows can be drawn between Balconies and other entities like rooms.
- Building Permission
- Layout With Housing And Gated Community & Layout With Housing Without Gated Community
- Length
- Max Projected Length Into OpenSpace
- Height
- Projection Height from Ground Level or Podium